Madison County Land Judging
Oct 14, 2026
Madison County
Overall

ID: 178 - -
Team Name: New Hope
Participant Name:
CAMDEN PRINCE
Individual Rank: 9
Individual Total Score: 99
Team Rank: 2
Team Total Score: 352
View e-Scansheet

DefinitionResponsesScore
Part 1 - Field 1
PartContestantJudge
1Surface Texture - Moderately Coarse
Subsoil Texture - Moderately Coarse
Depth of Soil - Moderately Deep
Slope - Moderately Sloping
Erosion - Water - None to Slight
Permeability - Moderate
Surface Runoff - Moderate
Major Factors - Slope
Major Factors - Permeability
Major Factors - Runoff
Land Capability Class - Class I
Surface Texture - Medium
Subsoil Texture - Moderately Fine
Depth of Soil - Deep
Slope - Gently Sloping
Erosion - Water - Moderate
Permeability - Slow
Surface Runoff - Rapid
Major Factors - Slope
Major Factors - Erosion
Major Factors - Permeability
Major Factors - Runoff
Land Capability Class - Class II
18
Part 1 - Field 2
PartContestantJudge
1Surface Texture - Medium
Subsoil Texture - Moderately Fine
Depth of Soil - Moderately Deep
Slope - Gently Sloping
Erosion - Water - None to Slight
Permeability - Slow
Surface Runoff - Slow
Major Factors - None
Land Capability Class - Class II
Surface Texture - Fine
Subsoil Texture - Fine
Depth of Soil - Deep
Slope - Nearly Level
Erosion - Water - Moderate
Permeability - Very Slow
Surface Runoff - Slow
Major Factors - Permeability
Land Capability Class - Class IV
13
Part 1 - Field 3
PartContestantJudge
1Surface Texture - Medium
Subsoil Texture - Moderately Fine
Depth of Soil - Moderately Deep
Slope - Nearly Level
Erosion - Water - None to Slight
Permeability - Moderate
Surface Runoff - Slow
Major Factors - None
Land Capability Class - Class I
Surface Texture - Moderately Fine
Subsoil Texture - Fine
Depth of Soil - Deep
Slope - Nearly Level
Erosion - Water - Moderate
Permeability - Very Slow
Surface Runoff - Slow
Major Factors - Permeability
Land Capability Class - Class IV
12
Part 2 - Cropland
PartContestantJudge
1 4. Use for row crops (4)
5. Farm on contour
11. Gully control
13. Apply lime
14. Use fertilizer ratio 1-1-1
2. Use for row crops (2)
5. Farm on contour
6. Install water disposal system
8. Build terraces
12. Establish field borders
14. Use fertilizer ratio 1-1-1
10
Part 2 - Pastureland
PartContestantJudge
1 3. Grazing management
5. Improve forage quality and production of existing pasture
7. Gully control
8. Apply lime
9. Apply fertilizer ratio 0-1-1
4. Control undesirable plants of existing pasture
5. Improve forage quality and production of existing pasture
6. Install drainage system
8. Apply lime
10. Apply fertilizer ratio 0-2-1
12
Part 2 - Forestland
PartContestantJudge
1 1. Prescribe burn
2. Establish firebreaks
5. Harvest trees selectively
6. Harvest trees by clearcutting
8. Precommercial thinning
2. Establish firebreaks
4. Plant recommended trees
6. Harvest trees by clearcutting
7. Control undesirable species
9. Prepare site for planting
12
Homesite - Part I
PartContestantJudge
1Surface Texture - Moderately Coarse
Subsoil Texture - Medium
Depth of Soil - Moderately Deep
Slope - Gently Sloping
Erosion - Water - None to Slight
Permeability - Slow
Soil Drainage - Good
Flooding - None
Shrink-Swell - Low
Rocks - 5 - 25%
Surface Texture - Moderately Fine
Subsoil Texture - Fine
Depth of Soil - Deep
Slope - Nearly Level
Erosion - Water - Moderate
Permeability - Very Slow
Soil Drainage - Good
Flooding - None
Shrink-Swell - High
Rocks - Less than 5%
16
Homesite - Part IIIA
PartContestantJudge
1Septic Tank Filter Fields - Slight
Local Roads and Streets - Slight
Foundations Without Basements - Slight
Lawns and Landscapes - Slight
Septic Tank Filter Fields - Severe
Local Roads and Streets - Severe
Foundations Without Basements - Severe
Lawns and Landscapes - Slight
6
Homesite - Part IIIB
PartContestantJudge
1 Permeability
Shrink-Swelling
 
Cropland Total
28
Pastureland Total
25
Forestland Total
24
Homesite Total
22


AWS100: Thursday, November 12, 2026