Alabama Sand Mountain Classic
Oct 29, 2026
Sand Mountain Classic
Overall

ID: 6 - -
Team Name: Albertville
Participant Name:
MARK LOGAN
Individual Rank: 21
Individual Total Score: 181
Team Rank: 4
Team Total Score: 580
View e-Scansheet

DefinitionResponsesScore
Part 1 - Field 1
PartContestantJudge
1Surface Texture - Medium
Subsoil Texture - Moderately Coarse
Depth of Soil - Deep
Slope - Strong Sloping
Erosion - Water - None to Slight
Permeability - Moderate
Surface Runoff - Rapid
Major Factors - Slope
Land Capability Class - Class IV
Surface Texture - Moderately Coarse
Subsoil Texture - Moderately Fine
Depth of Soil - Deep
Slope - Strong Sloping
Erosion - Water - Moderate
Permeability - Slow
Surface Runoff - Rapid
Major Factors - Slope
Land Capability Class - Class IV
25
Part 1 - Field 2
PartContestantJudge
1Surface Texture - Moderately Coarse
Subsoil Texture - Moderately Coarse
Depth of Soil - Deep
Slope - Moderately Sloping
Erosion - Water - Moderate
Permeability - Moderate
Surface Runoff - Rapid
Major Factors - Slope
Land Capability Class - Class III
Surface Texture - Moderately Coarse
Subsoil Texture - Moderately Fine
Depth of Soil - Deep
Slope - Strong Sloping
Erosion - Water - Moderate
Permeability - Slow
Surface Runoff - Rapid
Major Factors - Slope
Land Capability Class - Class IV
24
Part 1 - Field 3
PartContestantJudge
1Surface Texture - Moderately Coarse
Subsoil Texture - Medium
Depth of Soil - Moderately Deep
Slope - Moderately Sloping
Erosion - Water - Moderate
Permeability - Moderate
Surface Runoff - Rapid
Major Factors - Slope
Land Capability Class - Class III
Surface Texture - Moderately Coarse
Subsoil Texture - Moderately Fine
Depth of Soil - Deep
Slope - Gently Sloping
Erosion - Water - Moderate
Permeability - Slow
Surface Runoff - Rapid
Major Factors - Slope
Major Factors - Erosion
Major Factors - Permeability
Major Factors - Runoff
Land Capability Class - Class II
20
Part 2 - Cropland
PartContestantJudge
1 4. Use for row crops (4)
6. Install water disposal system
7. Maintain existing underground outlets, grassed waterways or grassed outlets
8. Build terraces
10. Install or maintain drainage system
12. Establish field borders
13. Apply lime
16. Use fertilizer ratio 1-4-2
4. Use for row crops (4)
5. Farm on contour
6. Install water disposal system
8. Build terraces
12. Establish field borders
13. Apply lime
16. Use fertilizer ratio 1-4-2
21
Part 2 - Pastureland
PartContestantJudge
1 4. Control undesirable plants of existing pasture
5. Improve forage quality and production of existing pasture
8. Apply lime
11. Apply fertilizer ratio 0-1-2
4. Control undesirable plants of existing pasture
5. Improve forage quality and production of existing pasture
8. Apply lime
11. Apply fertilizer ratio 0-1-2
30
Part 2 - Forestland
PartContestantJudge
1 2. Establish firebreaks
4. Plant recommended trees
6. Harvest trees by clearcutting
9. Prepare site for planting
2. Establish firebreaks
3. Maintain existing firebreaks
7. Control undesirable species
10. Control erosion
8
Homesite - Part I
PartContestantJudge
1Surface Texture - Moderately Coarse
Subsoil Texture - Medium
Depth of Soil - Deep
Slope - Gently Sloping
Erosion - Water - Severe
Permeability - Moderate
Soil Drainage - Fair
Flooding - None
Shrink-Swell - Moderate
Rocks - Less than 5%
Surface Texture - Moderately Coarse
Subsoil Texture - Moderately Fine
Depth of Soil - Deep
Slope - Gently Sloping
Erosion - Water - Severe
Permeability - Slow
Soil Drainage - Fair
Flooding - None
Shrink-Swell - Low
Rocks - Less than 5%
26
Homesite - Part IIIA
PartContestantJudge
1Septic Tank Filter Fields - Moderate
Local Roads and Streets - Moderate
Foundations Without Basements - Moderate
Lawns and Landscapes - Moderate
Septic Tank Filter Fields - Moderate
Local Roads and Streets - Moderate
Foundations Without Basements - Moderate
Lawns and Landscapes - Moderate
24
Homesite - Part IIIB
PartContestantJudge
1Soil Drainage
Shrink-Swelling
Permeability
Soil Drainage
3
Cropland Total
46
Pastureland Total
54
Forestland Total
28
Homesite Total
53


AWS100: Thursday, November 12, 2026