Lamar Community College Regional CDEs
Mar 26, 2025
Land Judging 2025
Overall

ID: 41 - 5 -
Team Name: McClave
Participant Name:
TIM PACINO
Individual Rank: 9
Individual Total Score: 143
Team Rank: 2
Team Total Score: 455
View e-Scansheet

DefinitionResponsesScore
Part 1 - Horizon Identification
PartContestantJudge
1Surface: A
Subsoil: B
Surface: Ap
Subsoil: B
Part 1/2 Points per Question5
5
Part 1 - Horizon Texture
PartContestantJudge
1Surface: fine
Subsoil: medium
Surface: fine
Subsoil: fine
Part 1/2 Points per Question5
5
Part 1 - Horizon Color
PartContestantJudge
1Surface: dark
Subsoil: medium
Surface: dark
Subsoil: medium
Part 1/2 Points per Question5
10
Part 1 - Structure Type
PartContestantJudge
1Surface: granualar
Subsoil: granular
Surface: granualar
Subsoil: blocky
Part 1/2 Points per Question5
5
Part 1 - Structure Size
PartContestantJudge
1Surface: fine
Subsoil: medium
Surface: coarse
Subsoil: coarse
Part 1/2 Points per Question5
0
Part 1 - Slope
PartContestantJudge
13 - 5%3 - 5%
Part 1/2 Points per Question5
5
Part 1 - Internal Drainage
PartContestantJudge
1mediumslow
Part 1/2 Points per Question5
0
Part 1 - Erosion
PartContestantJudge
1moderateslight
Part 1/2 Points per Question5
0
Part 1 - Soil Depth
PartContestantJudge
1very deepvery deep
Part 1/2 Points per Question5
5
Part 1 Soil Characteristics Total
35
Part 2 - Problems Affecting Use
PartContestantJudge
1
  • available soil water
  • available soil water
  • Part 2 - Problems Affecting Use Point Valuesrooting depth
    surface soil texture
    erosion
    stoniness
    poor drainage
    seasonal flooding
    saline-alkali
    available soil water 2
    2
    Part 2 - Land Capability Class
    PartContestantJudge
    1VIIIIII
    Part 2 - Land Capability Class Point Value5
    0
    Part 2 - Rec. Land Use
    PartContestantJudge
    1closely sown cropsall adapted crops
    Part 1/2 Points per Question5
    0
    Part 2 - Rec. Conservation Pract.
    PartContestantJudge
    1
  • grass waterways

  • retain crop residues on surface
  • timely tillage

  • organic matter maintenance
  • Part 2 - Rec. Conservation Pract. Point Valuesgrass waterways
    contour tillage
    contour strips
    wind strips
    field strips
    terraces or diversions
    land drainage
    mow pasture
    establish cover
    retain crop residues on surface
    eradicate brush or weeds
    timely tillage 2
    organic matter maintenance 2
    proper grazing use
    0
    Part 2 - Irrigation Methods
    PartContestantJudge
    1
  • sprinkler
  • sprinkler
  • Part 2 - Irrigation Methods Point Valuessprinkler 2
    basin or level border
    border
    furrow
    contour furrow
    contour ditch
    2
    Part 2 - Soluble Salt Level
    PartContestantJudge
    1lowlow
    Part 1/2 Points per Question5
    5
    Part 2 Ag Interpretations Total
    9
    Fertilizer: NO3-N
    PartContestantJudge
    1250205
    Part 1/2 Points per Question5
    0
    Fertilizer: P2O5
    PartContestantJudge
    1020080
    Part 1/2 Points per Question5
    0
    Fertilizer: K2O
    PartContestantJudge
    1 060 060
    Part 1/2 Points per Question5
    0
    Fertilizer: Zn
    PartContestantJudge
    10000
    Part 1/2 Points per Question5
    5
    Fertilizer: Fe
    PartContestantJudge
    10000
    Part 1/2 Points per Question5
    5
    Fertilizer Total
    10
    Part 1/2 Soil Char / Ag Int Total
    54
    Homesite Pit 1 - Part 1
    PartContestantJudge
    1Texture Surface: Mod Crse, Med, Mod Fine
    Permeability: Moderate (0.6-2.0"/hr.)
    Depth of Soil: V. Deep (over 72")
    Slope: N.L. to Gentle (0-3%)
    Erosion: None-Slight-Moderate
    Surface Runoff: Rapid
    Shrink-Swell: Moderate
    Water Table: Mod. Deep (40-72")
    Flooding: None
    Texture Surface: Fine
    Permeability: Slow (0.06-0.6"/hr.)
    Depth of Soil: V. Deep (over 72")
    Slope: N.L. to Gentle (0-3%)
    Erosion: None-Slight-Moderate
    Surface Runoff: Moderate
    Shrink-Swell: Moderate
    Water Table: Deep (>72")
    Flooding: None
    Homesite Part 1 - Points per Correct3
    15
    Homesite Pit 1 - Part 2
    PartContestantJudge
    1Texture - Foundations: Slight
    Texture - Lawns: Slight
    Permeability - Lawns: Slight
    Permeability - Septic: Slight
    Permeability - Lagoon: Moderate
    Depth - Foundations: Slight
    Depth - Lawns: Moderate
    Depth - Septic: Slight
    Depth - Lagoon: Slight
    Slope - Foundations: Slight
    Slope - Lawns: Slight
    Slope - Septic: Slight
    Slope - Lagoon: Slight
    Erosion - Foundations: Slight
    Erosion - Lawns: Moderate
    Erosion - Septic: Severe
    Erosion - Lagoon: Slight
    Shrink-Swell - Foundations: Moderate
    Shrink-Swell - Septic: Moderate
    Shrink-Swell - Lagoon: Slight
    Water Table - Foundations: Slight
    Water Table - Lawns: Moderate
    Water Table - Septic: Moderate
    Water Table - Lagoon: Slight
    Flooding - Foundations: Slight
    Flooding - Lawns: Slight
    Flooding - Septic: Moderate
    Flooding - Lagoon: Slight
    Final Eval. - Foundations: Slight
    Final Eval. - Lawns: Slight
    Final Eval. - Septic: Moderate
    Final Eval. - Lagoon: Slight
    Texture - Foundations: Severe
    Texture - Lawns: Moderate
    Permeability - Lawns: Slight
    Permeability - Septic: Moderate
    Permeability - Lagoon: Moderate
    Depth - Foundations: Slight
    Depth - Lawns: Slight
    Depth - Septic: Slight
    Depth - Lagoon: Slight
    Slope - Foundations: Slight
    Slope - Lawns: Slight
    Slope - Septic: Slight
    Slope - Lagoon: Slight
    Erosion - Foundations: Slight
    Erosion - Lawns: Slight
    Erosion - Septic: Slight
    Erosion - Lagoon: Slight
    Runoff - Foundations: Slight
    Runoff - Lawns: Slight
    Runoff - Septic: Slight
    Shrink-Swell - Foundations: Moderate
    Shrink-Swell - Septic: Moderate
    Shrink-Swell - Lagoon: Slight
    Water Table - Foundations: Slight
    Water Table - Lawns: Slight
    Water Table - Septic: Slight
    Water Table - Lagoon: Slight
    Flooding - Foundations: Slight
    Flooding - Lawns: Slight
    Flooding - Septic: Slight
    Flooding - Lagoon: Slight
    Final Eval. - Foundations: Severe
    Final Eval. - Lawns: Moderate
    Final Eval. - Septic: Moderate
    Final Eval. - Lagoon: Moderate
    Homesite Part 2 - Points per Correct2
    40
    Homesite Pit 2 - Part 1
    Homesite Part 1 - Points per Correct3
     
    Homesite Pit 2 - Part 2
    Homesite Part 2 - Points per Correct2
     
    Homesite Total
    55
    Soil Survey Score
    PartContestantJudge
    1034100
    34
    Manual Score 2
     
    Manual Score 3
     


    AWS100: Saturday, June 14, 2025