| Definition | Responses | Score |
| Hole 1 |
| Part | Contestant | Judge |
| 1 | Loess 3-6% Upland hillslope Brown Severe Moderately clayey Clayey Well Fragipan, 21-40 in | Loess 3-6% Upland hillslope Brown Moderate Medium Medium Moderately well Fragipan, 21-40 in |
| 25 |
| Hole 2 |
| Part | Contestant | Judge |
| 1 | Weathered bedrock 19-25% Upland hillslope Brown None to slight Moderately clayey Clayey Well None within 40 in | Weathered bedrock 13-18% Upland hillslope Black Moderate Medium Moderately clayey Well None within 40 in |
| 20 |
| Hole 3 |
| Part | Contestant | Judge |
| 1 | Local overwash 0-2% Filled depression Brown None to slight Medium Moderately clayey Well None within 40 in | Local overwash 0-2% Filled depression Gray None to slight Medium Medium Well None within 40 in |
| 35 |
| Hole 4 |
| Part | Contestant | Judge |
| 1 | Loess 7-12% Upland hillslope Brown Moderate Medium Moderately clayey Poorly Fragipan, 0-20 in | Loess 7-12% Upland hillslope Gray Moderate Medium Clayey Somewhat poorly None within 40 in |
| 25 |
| Part 1 - Field 5 |
| |
| Part 1 Total |
| 105 |
| Homesite |
| |
| Ag Site |
| Part | Contestant | Judge |
| 1 | 1. Land Use - Restore vegetation C 2. Land Use - Prime farmland Y 3. Erosion/Compaction: water Y 4. Erosion/Compaction: wind N 5. Erosion/Compaction: soil compaction N 6. Buffers/Cover Crops: Grassed waterways Y 7. Buffers/Cover Crops: Windbreaks N 8. Buffers/Cover Crops: Filter strips N 9. Buffers/Cover Crops: Cover crops C 10. Cropping Practices: TSI Y 11. Cropping Practices: Permanent pasture Y 12. Cropping Practices: Crop rotation Y 13. Tillage Practices: No till Y 14. Tillage Practices: Moldboard or chisel Y 15. Water Mgmt: Drainage N 16. Water Mgmt: Irrigation Y 17. Water Mgmt: Terraces Y 18. Plant Nutrients: N B 19. Plant Nutrients: P B 20. Plant Nutrients: K C 21. Plant Nutrients: Lime A 22. Nutrient Pollution: Nitrogen C 23. Nutrient Pollution: Phosphorus B | 1. Land Use - Restore vegetation C 2. Land Use - Prime farmland N 3. Erosion/Compaction: water Y 4. Erosion/Compaction: wind N 5. Erosion/Compaction: soil compaction N 6. Buffers/Cover Crops: Grassed waterways Y 7. Buffers/Cover Crops: Windbreaks N 8. Buffers/Cover Crops: Filter strips Y 9. Buffers/Cover Crops: Cover crops C 10. Cropping Practices: TSI Y 11. Cropping Practices: Permanent pasture Y 12. Cropping Practices: Crop rotation Y 13. Tillage Practices: No till N 14. Tillage Practices: Moldboard or chisel N 15. Water Mgmt: Drainage N 16. Water Mgmt: Irrigation N 17. Water Mgmt: Terraces N 18. Plant Nutrients: N A 19. Plant Nutrients: P C 20. Plant Nutrients: K B 21. Plant Nutrients: Lime A 22. Nutrient Pollution: Nitrogen C 23. Nutrient Pollution: Phosphorus A |
| 39 |
| Ag Site |
| Part | Contestant | Judge |
| 1 | 1. Land Use - Restore vegetation C 2. Land Use - Prime farmland Y 3. Erosion/Compaction: water N 4. Erosion/Compaction: wind N 5. Erosion/Compaction: soil compaction N 6. Buffers/Cover Crops: Grassed waterways N 7. Buffers/Cover Crops: Windbreaks N 8. Buffers/Cover Crops: Filter strips Y 9. Buffers/Cover Crops: Cover crops B 10. Cropping Practices: TSI Y 11. Cropping Practices: Permanent pasture Y 12. Cropping Practices: Crop rotation Y 13. Tillage Practices: No till Y 14. Tillage Practices: Moldboard or chisel N 15. Water Mgmt: Drainage Y 16. Water Mgmt: Irrigation N 17. Water Mgmt: Terraces N 18. Plant Nutrients: N B 19. Plant Nutrients: P C 20. Plant Nutrients: K C 21. Plant Nutrients: Lime B 22. Nutrient Pollution: Nitrogen B 23. Nutrient Pollution: Phosphorus B | 1. Land Use - Restore vegetation C 2. Land Use - Prime farmland Y 3. Erosion/Compaction: water N 4. Erosion/Compaction: wind N 5. Erosion/Compaction: soil compaction N 6. Buffers/Cover Crops: Grassed waterways N 7. Buffers/Cover Crops: Windbreaks N 8. Buffers/Cover Crops: Filter strips Y 9. Buffers/Cover Crops: Cover crops A 10. Cropping Practices: TSI Y 11. Cropping Practices: Permanent pasture Y 12. Cropping Practices: Crop rotation Y 13. Tillage Practices: No till Y 14. Tillage Practices: Moldboard or chisel N 15. Water Mgmt: Drainage N 16. Water Mgmt: Irrigation N 17. Water Mgmt: Terraces N 18. Plant Nutrients: N B 19. Plant Nutrients: P C 20. Plant Nutrients: K B 21. Plant Nutrients: Lime B 22. Nutrient Pollution: Nitrogen C 23. Nutrient Pollution: Phosphorus C |
| 54 |
| Homesite |
| Part | Contestant | Judge |
| 1 | 1. Land Use - Restore vegetation C 2. Land Use - Prime farmland Y 3. Erosion/Compaction: water 4. Erosion/Compaction: wind 5. Erosion/Compaction: soil compaction 6. Buffers/Cover Crops: Grassed waterways 7. Buffers/Cover Crops: Windbreaks 8. Buffers/Cover Crops: Filter strips 9. Buffers/Cover Crops: Cover crops 10. Cropping Practices: TSI 11. Cropping Practices: Permanent pasture 12. Cropping Practices: Crop rotation 13. Tillage Practices: No till 14. Tillage Practices: Moldboard or chisel 15. Water Mgmt: Drainage 16. Water Mgmt: Irrigation 17. Water Mgmt: Terraces 18. Plant Nutrients: N 19. Plant Nutrients: P 20. Plant Nutrients: K 21. Plant Nutrients: Lime 22. Nutrient Pollution: Nitrogen 23. Nutrient Pollution: Phosphorus | |
| 0 |
| Part 2 Ag - Field 5 |
| |
| Part 2 Ag Total |
| 93 |
| Part 2 Homesite - Field 1 |
| Part | Contestant | Judge |
| 1 | 1. Suitable for homesite Y 2. Preserve/plant trees Y 3. Maintain soil cover Y 4. Improve drainage N 5. Suitable for basement N 6. High-clay subsoils Y 7. Construction hazards N 8. Diversion structures/drains Y 9. Foundation drainage Y 10. Risk for cave-in N 11. Acid-loving shrubs B 12. Soil reaction for lawns B 13. Apply Phosphorus Y 14. Apply Potassium N 15. Suitable for absorption field Y 16. Septic filter cleaning interval A 17. Septic pumping interval A 18. Subsurface trench, gravity flow N 19. Subsurface trench, flood dose N 20. Subsurface trench, pressure distrib. N 21. Elevated sand mound Y 22. Elev. sand mound & subsurface drain Y 23. Drip distribution & secondary treatment Y 24. Secondary treatment Y | 1. Suitable for homesite Y 2. Preserve/plant trees Y 3. Maintain soil cover Y 4. Improve drainage N 5. Suitable for basement N 6. High-clay subsoils N 7. Construction hazards N 8. Diversion structures/drains Y 9. Foundation drainage Y 10. Risk for cave-in N 11. Acid-loving shrubs A 12. Soil reaction for lawns A 13. Apply Phosphorus N 14. Apply Potassium N 15. Suitable for absorption field Y 16. Septic filter cleaning interval A 17. Septic pumping interval A 18. Subsurface trench, gravity flow N 19. Subsurface trench, flood dose N 20. Subsurface trench, pressure distrib. N 21. Elevated sand mound Y 22. Elev. sand mound & subsurface drain N 23. Drip distribution & secondary treatment Y 24. Secondary treatment Y |
| 57 |
| Part 2 Homesite - Field 2 |
| |
| Part 2 Homesite - Field 3 |
| |
| Part 2 Homesite - Field 4 |
| Part | Contestant | Judge |
| 1 | 1. Suitable for homesite Y 2. Preserve/plant trees Y 3. Maintain soil cover Y 4. Improve drainage Y 5. Suitable for basement N 6. High-clay subsoils N 7. Construction hazards N 8. Diversion structures/drains Y 9. Foundation drainage Y 10. Risk for cave-in N 11. Acid-loving shrubs A 12. Soil reaction for lawns A 13. Apply Phosphorus N 14. Apply Potassium N 15. Suitable for absorption field Y 16. Septic filter cleaning interval B 17. Septic pumping interval B 18. Subsurface trench, gravity flow N 19. Subsurface trench, flood dose N 20. Subsurface trench, pressure distrib. N 21. Elevated sand mound Y 22. Elev. sand mound & subsurface drain Y 23. Drip distribution & secondary treatment N 24. Secondary treatment Y | 1. Suitable for homesite Y 2. Preserve/plant trees Y 3. Maintain soil cover Y 4. Improve drainage N 5. Suitable for basement N 6. High-clay subsoils Y 7. Construction hazards N 8. Diversion structures/drains Y 9. Foundation drainage Y 10. Risk for cave-in N 11. Acid-loving shrubs A 12. Soil reaction for lawns A 13. Apply Phosphorus N 14. Apply Potassium N 15. Suitable for absorption field Y 16. Septic filter cleaning interval B 17. Septic pumping interval B 18. Subsurface trench, gravity flow N 19. Subsurface trench, flood dose N 20. Subsurface trench, pressure distrib. N 21. Elevated sand mound N 22. Elev. sand mound & subsurface drain N 23. Drip distribution & secondary treatment N 24. Secondary treatment N |
| 57 |
| Part 2 Homesite - Field 5 |
| |
| Part 2 Homesite Total |
| 114 |
| Field 1 Total |
| 82 |
| Field 2 Total |
| 59 |
| Field 3 Total |
| 89 |
| Field 4 Total |
| 82 |
| Field 5 Total |
| |