Iredell County Land Judging CDE
Oct 07, 2025
Iredell Land Judging alternates
Overall

ID: 690 - -
Team Name:
Participant Name:
EZRA ALMOND
Individual Rank: 9
Individual Total Score: 116
Team Rank: 2
Team Total Score: 428

DefinitionResponsesScore
Part I - Field 1
PartContestantJudge
1Sandy
Single Grain
Loose
Severe
Clayey
Platy
Friable
Very Sticky
Rapid
Shallow (12-24")
6-10% Sloping
Well
Potential hazard
Rapid
Loamy
Granular
Friable
Moderate
Loamy
Blocky
Friable
Sticky
Moderate
Deep (>36")
2-6% Gently sloping
Well
No hazard
Moderate
Part I - Field 1 - Point ValuesSurface Texture 4
Surface Structure 3
Surface Consistence 3
Surface Erosion 4
Subsurface Texture 4
Subsurface Structure 3
Subsurface Consistence (Moist) 2
Subsurface Consistence (Wet) 2
Subsurface Permeability 2
Subsurface Depth 2
Total Slope 5
Total Drainage 3
Total Flooding 3
Total Surface Water Removal 3
5
Part I - Field 2
PartContestantJudge
1Clayey
Blocky
Firm
None to slight
Clayey
Granular
Loose
Sticky
Moderate
Shallow (12-24")
25%+ Very steep
Somewhat Poorly
In flood plain
Slow
Loamy
Granular
Friable
None to slight
Clayey
Blocky
Friable
Sticky
Moderate
Deep (>36")
10-15% Strongly sloping
Well
No hazard
Rapid
Part I - Field 2 - Point ValuesSurface Texture 4
Surface Structure 3
Surface Consistence 3
Surface Erosion 4
Subsurface Texture 4
Subsurface Structure 3
Subsurface Consistence (Moist) 2
Subsurface Consistence (Wet) 2
Subsurface Permeability 2
Subsurface Depth 2
Total Slope 5
Total Drainage 3
Total Flooding 3
Total Surface Water Removal 3
12
Part I - Field 3
PartContestantJudge
1Loamy
Single Grain
Loose
Severe
Clayey
Blocky
Firm
Very Sticky
Very Slow
Moderately Deep (24-36")
2-6% Gently sloping
Very Poorly
In flood plain
Very slow
Loamy
Granular
Friable
None to slight
Clayey
Massive
Firm
Sticky
Very Slow
Deep (>36")
2-6% Gently sloping
Poorly
In flood plain
Slow
Part I - Field 3 - Point ValuesSurface Texture 4
Surface Structure 3
Surface Consistence 3
Surface Erosion 4
Subsurface Texture 4
Subsurface Structure 3
Subsurface Consistence (Moist) 2
Subsurface Consistence (Wet) 2
Subsurface Permeability 2
Subsurface Depth 2
Total Slope 5
Total Drainage 3
Total Flooding 3
Total Surface Water Removal 3
20
Part I - Field 4
PartContestantJudge
1Loamy
Granular
Friable
Moderate
Clayey
Blocky
Friable
Very Sticky
Moderate
Moderately Deep (24-36")
25%+ Very steep
Somewhat Poorly
No hazard
Rapid
Loamy
Granular
Friable
None to slight
Clayey
Blocky
Firm
Sticky
Slow
Deep (>36")
15-25% Steep
Well
No hazard
Rapid
Part I - Field 4 - Point ValuesSurface Texture 4
Surface Structure 3
Surface Consistence 3
Surface Erosion 4
Subsurface Texture 4
Subsurface Structure 3
Subsurface Consistence (Moist) 2
Subsurface Consistence (Wet) 2
Subsurface Permeability 2
Subsurface Depth 2
Total Slope 5
Total Drainage 3
Total Flooding 3
Total Surface Water Removal 3
23
Part I Total
60
Part II - Field 1
PartContestantJudge
1IIeIIe
Part II - Point Value10
10
Part II - Field 2
PartContestantJudge
1IIwIVe
Part II - Point Value10
0
Part II - Field 3
PartContestantJudge
1IIsIIe
Part II - Point Value10
0
Part II - Field 4
PartContestantJudge
1IIIeVIe
Part II - Point Value10
0
Part II Total
10
Part III - Field 1
PartContestantJudge
12. Conservation tillage, manage crop residue
5. Soil conserving crop 1 year in 4
6. Soil conserving crop 1 year in 3
19. Stabilize sediment source areas
24. Proper pasture management
2. Conservation tillage, manage crop residue
4. Row crop each year
10. Contour farming
12. Terrace and maintain terraces
15. Establish field border
Part III - Field 1 - Point Values1. Conventional tillage, conserve crop residue
2. Conservation tillage, manage crop residue 06
3. Long-Term No Till
4-9. Conservation Cropping System 06
10. Contour farming 05
11. Strip cropping
12. Terrace and maintain terraces 05
13. Construct diversion
14. Establish grassed waterway
15. Establish field border 05
16. Establish windbreak
17. Install water table control
18. Install surface water management
19. Stabilize sediment source areas
20. Establish recommended grass/legumes
21. Plant recommended trees
22. Remove obstructions
23. Control grazing
24. Proper pasture management
25. Improve tree stand
26. Woodland protection
27. Harvest trees using recommended method
6
Part III - Field 2
PartContestantJudge
11. Conventional tillage, conserve crop residue
5. Soil conserving crop 1 year in 4
14. Establish grassed waterway
23. Control grazing
3. Long-Term No Till
4. Row crop each year
Part III - Field 2 - Point Values1. Conventional tillage, conserve crop residue
2. Conservation tillage, manage crop residue
3. Long-Term No Till 14
4-9. Conservation Cropping System 13
10. Contour farming
11. Strip cropping
12. Terrace and maintain terraces
13. Construct diversion
14. Establish grassed waterway
15. Establish field border
16. Establish windbreak
17. Install water table control
18. Install surface water management
19. Stabilize sediment source areas
20. Establish recommended grass/legumes
21. Plant recommended trees
22. Remove obstructions
23. Control grazing
24. Proper pasture management
25. Improve tree stand
26. Woodland protection
27. Harvest trees using recommended method
0
Part III - Field 3
PartContestantJudge
11. Conventional tillage, conserve crop residue
5. Soil conserving crop 1 year in 4
17. Install water table control
22. Remove obstructions
3. Long-Term No Till
4. Row crop each year
15. Establish field border
17. Install water table control
18. Install surface water management
Part III - Field 3 - Point Values1. Conventional tillage, conserve crop residue
2. Conservation tillage, manage crop residue
3. Long-Term No Till 06
4-9. Conservation Cropping System 06
10. Contour farming
11. Strip cropping
12. Terrace and maintain terraces
13. Construct diversion
14. Establish grassed waterway
15. Establish field border 05
16. Establish windbreak
17. Install water table control 05
18. Install surface water management 05
19. Stabilize sediment source areas
20. Establish recommended grass/legumes
21. Plant recommended trees
22. Remove obstructions
23. Control grazing
24. Proper pasture management
25. Improve tree stand
26. Woodland protection
27. Harvest trees using recommended method
5
Part III - Field 4
PartContestantJudge
11. Conventional tillage, conserve crop residue
5. Soil conserving crop 1 year in 4
15. Establish field border
23. Control grazing
20. Establish recommended grass/legumes
23. Control grazing
24. Proper pasture management
Part III - Field 4 - Point Values1. Conventional tillage, conserve crop residue
2. Conservation tillage, manage crop residue
3. Long-Term No Till
4-9. Conservation Cropping System
10. Contour farming
11. Strip cropping
12. Terrace and maintain terraces
13. Construct diversion
14. Establish grassed waterway
15. Establish field border
16. Establish windbreak
17. Install water table control
18. Install surface water management
19. Stabilize sediment source areas
20. Establish recommended grass/legumes 09
21. Plant recommended trees
22. Remove obstructions
23. Control grazing 09
24. Proper pasture management 09
25. Improve tree stand
26. Woodland protection
27. Harvest trees using recommended method
0
Part III Total
11
Part IV - Field 1 Limitations
PartContestantJudge
1Slight
Slight
Moderate
Moderate
Severe
Slight
Slight
Slight
Slight
Slight
Part IV Limitations - Points per Question3
6
Part IV - Field 1 Environmental Concerns
PartContestantJudge
1Environmental Concern 1
Environmental Concern 2
Environmental Concern 5
 
Part IV Environment Concerns - Points per Question1
0
Part IV - Field 2 Limitations
PartContestantJudge
1Severe
Severe
Severe
Slight
Severe
Moderate
Moderate
Moderate
Slight
Slight
Part IV Limitations - Points per Question3
3
Part IV - Field 2 Environmental Concerns
PartContestantJudge
1Environmental Concern 1
Environmental Concern 3
Environmental Concern 4
Environmental Concern 5
Part IV Environment Concerns - Points per Question1
1
Part IV - Field 3 Limitations
PartContestantJudge
1Severe
Severe
Severe
Severe
Moderate
Severe
Severe
Severe
Severe
Severe
Part IV Limitations - Points per Question3
12
Part IV - Field 3 Environmental Concerns
PartContestantJudge
1Environmental Concern 1
Environmental Concern 2
Environmental Concern 3
Environmental Concern 4
Environmental Concern 1
Environmental Concern 4
Part IV Environment Concerns - Points per Question1
3
Part IV - Field 4 Limitations
PartContestantJudge
1Severe
Severe
Severe
Moderate
Moderate
Severe
Severe
Severe
Severe
Severe
Part IV Limitations - Points per Question3
9
Part IV - Field 4 Environmental Concerns
PartContestantJudge
1Environmental Concern 1
Environmental Concern 2
Environmental Concern 5
Environmental Concern 5
Part IV Environment Concerns - Points per Question1
1
Part IV Total
35
Field 1 Total
27
Field 2 Total
16
Field 3 Total
40
Field 4 Total
33
Team Activity
 


AWS100: Monday, November 3, 2025