North Carolina Land Judging CDE
Nov 15, 2025
NC FFA Land Judging - Junior
Overall

ID: 768 - 1 -
Team Name: Piedmont Middle FFA
Participant Name:
BRINKLEY CORRELL
Individual Rank: 53
Individual Total Score: 102
Team Rank: 14
Team Total Score: 439

DefinitionResponsesScore
Part I - Field 1
PartContestantJudge
1Loamy
Platy
Friable
Severe
Clayey
Blocky
Very Firm
Very Sticky
Very Slow
Shallow (12-24")
6-10% Sloping
Poorly
In flood plain
Slow
Loamy
Granular
Friable
None to slight
Clayey
Blocky
Firm
Sticky
Slow
Deep (>36")
2-6% Gently sloping
Moderately Well
No hazard
Moderate
Part I - Field 1 - Point ValuesSurface Texture 3
Surface Structure 3
Surface Consistence 3
Surface Erosion 3
Subsurface Texture 3
Subsurface Structure 3
Subsurface Consistence (Moist) 3
Subsurface Consistence (Wet) 3
Subsurface Permeability 3
Subsurface Depth 2
Total Slope 5
Total Drainage 5
Total Flooding 2
Total Surface Water Removal 2
12
Part I - Field 2
PartContestantJudge
1Clayey
Blocky
Firm
Severe
Clayey
Granular
Firm
Non-Sticky
Slow
Moderately Deep (24-36")
2-6% Gently sloping
Somewhat Poorly
Potential hazard
Moderate
Loamy
Granular
Friable
None to slight
Clayey
Blocky
Firm
Sticky
Slow
Deep (>36")
10-15% Strongly sloping
Well
No hazard
Rapid
Part I - Field 2 - Point ValuesSurface Texture 3
Surface Structure 3
Surface Consistence 3
Surface Erosion 3
Subsurface Texture 3
Subsurface Structure 3
Subsurface Consistence (Moist) 3
Subsurface Consistence (Wet) 3
Subsurface Permeability 3
Subsurface Depth 2
Total Slope 5
Total Drainage 5
Total Flooding 2
Total Surface Water Removal 2
9
Part I - Field 3
PartContestantJudge
1Clayey
Granular
Firm
Moderate
Clayey
Platy
Firm
Sticky
Moderate
Deep (>36")
Poorly
Potential hazard
Slow
Clayey
Blocky
Firm
Moderate
Clayey
Blocky
Firm
Sticky
Slow
Shallow (12-24")
2-6% Gently sloping
Well
No hazard
Moderate
Part I - Field 3 - Point ValuesSurface Texture 3
Surface Structure 3
Surface Consistence 3
Surface Erosion 4
Subsurface Texture 3
Subsurface Structure 3
Subsurface Consistence (Moist) 3
Subsurface Consistence (Wet) 3
Subsurface Permeability 3
Subsurface Depth 5
Total Slope 4
Total Drainage 2
Total Flooding 2
Total Surface Water Removal 2
19
Part I - Field 4
PartContestantJudge
1Loamy
Platy
Friable
Moderate
Clayey
Blocky
Very Firm
Very Sticky
Very Slow
Moderately Deep (24-36")
0-2% Nearly level
Very Poorly
Potential hazard
Very slow
Clayey
Blocky
Firm
Moderate
Clayey
Blocky
Firm
Sticky
Slow
Very Shallow (<12")
2-6% Gently sloping
Well
No hazard
Moderate
Part I - Field 4 - Point ValuesSurface Texture 3
Surface Structure 3
Surface Consistence 3
Surface Erosion 4
Subsurface Texture 3
Subsurface Structure 3
Subsurface Consistence (Moist) 3
Subsurface Consistence (Wet) 3
Subsurface Permeability 3
Subsurface Depth 5
Total Slope 4
Total Drainage 2
Total Flooding 2
Total Surface Water Removal 2
10
Part I Total
50
Part II - Field 1
PartContestantJudge
1IVeIIe
Part II - Point Value10
0
Part II - Field 2
PartContestantJudge
1IIIeIVe
Part II - Point Value10
0
Part II - Field 3
PartContestantJudge
1IIeIIIe
Part II - Point Value10
0
Part II - Field 4
PartContestantJudge
1IIeIVs
Part II - Point Value10
0
Part II Total
0
Part III - Field 1
PartContestantJudge
11. Conventional tillage, conserve crop residue
3. Long-Term No Till
6. Soil conserving crop 1 year in 3
8. Soil conserving crop 2 years in 3
12. Terrace and maintain terraces
14. Establish grassed waterway
15. Establish field border
23. Control grazing
24. Proper pasture management
1. Conventional tillage, conserve crop residue
4. Row crop each year
10. Contour farming
14. Establish grassed waterway
15. Establish field border
17. Install water table control
Part III - Field 1 - Point Values1. Conventional tillage, conserve crop residue 05
2. Conservation tillage, manage crop residue
3. Long-Term No Till
4-9. Conservation Cropping System 05
10. Contour farming 05
11. Strip cropping
12. Terrace and maintain terraces
13. Construct diversion
14. Establish grassed waterway 04
15. Establish field border 04
16. Establish windbreak
17. Install water table control 04
18. Install surface water management
19. Stabilize sediment source areas
20. Establish recommended grass/legumes
21. Plant recommended trees
22. Remove obstructions
23. Control grazing
24. Proper pasture management
25. Improve tree stand
26. Woodland protection
27. Harvest trees using recommended method
9
Part III - Field 2
PartContestantJudge
11. Conventional tillage, conserve crop residue
2. Conservation tillage, manage crop residue
5. Soil conserving crop 1 year in 4
7. Soil conserving crop 1 year in 2
12. Terrace and maintain terraces
14. Establish grassed waterway
16. Establish windbreak
17. Install water table control
20. Establish recommended grass/legumes
22. Remove obstructions
23. Control grazing
24. Proper pasture management
26. Woodland protection
3. Long-Term No Till
4. Row crop each year
15. Establish field border
Part III - Field 2 - Point Values1. Conventional tillage, conserve crop residue
2. Conservation tillage, manage crop residue
3. Long-Term No Till 09
4-9. Conservation Cropping System 09
10. Contour farming
11. Strip cropping
12. Terrace and maintain terraces
13. Construct diversion
14. Establish grassed waterway
15. Establish field border 09
16. Establish windbreak
17. Install water table control
18. Install surface water management
19. Stabilize sediment source areas
20. Establish recommended grass/legumes
21. Plant recommended trees
22. Remove obstructions
23. Control grazing
24. Proper pasture management
25. Improve tree stand
26. Woodland protection
27. Harvest trees using recommended method
0
Part III - Field 3
PartContestantJudge
12. Conservation tillage, manage crop residue
3. Long-Term No Till
6. Soil conserving crop 1 year in 3
8. Soil conserving crop 2 years in 3
13. Construct diversion
15. Establish field border
19. Stabilize sediment source areas
20. Establish recommended grass/legumes
22. Remove obstructions
24. Proper pasture management
26. Woodland protection
2. Conservation tillage, manage crop residue
8. Soil conserving crop 2 years in 3
10. Contour farming
11. Strip cropping
14. Establish grassed waterway
19. Stabilize sediment source areas
Part III - Field 3 - Point Values1. Conventional tillage, conserve crop residue
2. Conservation tillage, manage crop residue 05
3. Long-Term No Till
4-9. Conservation Cropping System 05
10. Contour farming 05
11. Strip cropping 05
12. Terrace and maintain terraces
13. Construct diversion
14. Establish grassed waterway 04
15. Establish field border
16. Establish windbreak
17. Install water table control
18. Install surface water management
19. Stabilize sediment source areas 03
20. Establish recommended grass/legumes
21. Plant recommended trees
22. Remove obstructions
23. Control grazing
24. Proper pasture management
25. Improve tree stand
26. Woodland protection
27. Harvest trees using recommended method
10
Part III - Field 4
PartContestantJudge
12. Conservation tillage, manage crop residue
8. Soil conserving crop 2 years in 3
10. Contour farming
16. Establish windbreak
17. Install water table control
18. Install surface water management
22. Remove obstructions
23. Control grazing
27. Harvest trees using recommended method
3. Long-Term No Till
4. Row crop each year
Part III - Field 4 - Point Values1. Conventional tillage, conserve crop residue
2. Conservation tillage, manage crop residue
3. Long-Term No Till 14
4-9. Conservation Cropping System 13
10. Contour farming
11. Strip cropping
12. Terrace and maintain terraces
13. Construct diversion
14. Establish grassed waterway
15. Establish field border
16. Establish windbreak
17. Install water table control
18. Install surface water management
19. Stabilize sediment source areas
20. Establish recommended grass/legumes
21. Plant recommended trees
22. Remove obstructions
23. Control grazing
24. Proper pasture management
25. Improve tree stand
26. Woodland protection
27. Harvest trees using recommended method
0
Part III Total
19
Part IV - Field 1 Limitations
PartContestantJudge
1Severe
Moderate
Moderate
Severe
Slight
Moderate
Severe
Moderate
Severe
Moderate
Part IV Limitations - Points per Question3
6
Part IV - Field 1 Environmental Concerns
PartContestantJudge
1Environmental Concern 2
Environmental Concern 3
Environmental Concern 4
 
Part IV Environment Concerns - Points per Question1
2
Part IV - Field 2 Limitations
PartContestantJudge
1Moderate
Moderate
Severe
Slight
Moderate
Moderate
Moderate
Moderate
Slight
Slight
Part IV Limitations - Points per Question3
9
Part IV - Field 2 Environmental Concerns
PartContestantJudge
1Environmental Concern 2
Environmental Concern 3
Environmental Concern 5
Part IV Environment Concerns - Points per Question1
2
Part IV - Field 3 Limitations
PartContestantJudge
1Severe
Moderate
Slight
Moderate
Severe
Severe
Severe
Severe
Severe
Severe
Part IV Limitations - Points per Question3
6
Part IV - Field 3 Environmental Concerns
PartContestantJudge
1Environmental Concern 1
Environmental Concern 3
 
Part IV Environment Concerns - Points per Question1
3
Part IV - Field 4 Limitations
PartContestantJudge
1Moderate
Slight
Moderate
Slight
Severe
Severe
Severe
Severe
Severe
Severe
Part IV Limitations - Points per Question3
3
Part IV - Field 4 Environmental Concerns
PartContestantJudge
1Environmental Concern 1
Environmental Concern 4
Environmental Concern 3
Part IV Environment Concerns - Points per Question1
2
Part IV Total
33
Field 1 Total
29
Field 2 Total
20
Field 3 Total
38
Field 4 Total
15
Team Activity
 


AWS100: Thursday, December 18, 2025